Skip to workspace
BAS Bridge
System explorer

Level 1 practical exam

The morning air complaint

The office should be receiving supply air. The workstation shows a start request. Investigate the complaint and leave the system ready for occupied operation.

Field assignment

Identify the equipment serving the office, inspect the request and proof, then select the two meter readings that distinguish a circuit interruption from a failed load. Record the diagnosis, correction, and measured recovery in the dispatch.

Open assessed work order · AHU-11

Required evidence includes the coil voltage during demand, isolated winding resistance, authorized repair and a sustained airflow retest. Your verified dispatch returns here.

Practical outstanding · Knowledge outstanding

Independent transfer assessment

Pass at 80%. Every safety item must also pass.

1. Under a steady heating call, air enters a coil at 58 °F and leaves at 71.5 °F. What is the temperature rise?
2. You need a resistance reading. Which condition must you establish first on the virtual board? · Required for safety
3. A fan start is requested and 24 V AC is measured across its relay winding. The fan is stationary. Which conclusion does the meter support?
4. A ceiling diffuser carries 410 cfm at 8 a.m. and 205 cfm at 9 a.m. What fraction of the earlier volume per minute remains, expressed as a percentage?
5. An insulated pipe's outer surface measures 51 °F. Room air has a dew point of 57 °F. What would you investigate first?
6. After the simulated repair, what evidence supports handing the air handler back to the operator? · Required for safety
7. Only the training office served by VAV-01 is warm. The adjacent zone on the same air handler is comfortable. Where can you compare what these zones actually receive?