Office building
Floor equipment, shared plant and HVAC/R electrical meters.
- Equipment demand
- Loading
- Accumulated electricity
- Loading
- Outdoor air
- Loading
- Active alarms
- Loading
Systems by location
Level 1
- AHU-01Open office and VAV-01 primary airSupply air temperature (SAT)LoadingPoints & meter
- VAV-01Conference zone supplied by AHU-01Zone air temperatureLoadingPoints
- FCU-01Perimeter office with hydronic coilsZone air temperatureLoadingPoints & meter
- REF-01Catering walk-in coolerBox air temperatureLoadingPoints & meter
Level 2
- AHU-02Upper-floor office zoneZone air temperatureLoadingPoints & meter
- RTU-01Packaged system serving the meeting suiteZone air temperatureLoadingPoints & meter
Mechanical services
- BLR-01Hot-water header, heating coils and terminal reheatSupervisory hot water supplyLoadingPoints & meter
- CH-01Chilled-water header and cooling coilsSupervisory chilled water supplyLoadingPoints & meter
- EF-01General building exhaustExhaust airflowLoadingPoints & meter
BACnet network
Loading devicesCompare the operator workstation’s readings across the building. An online object can report a fixed value. A disconnected controller continues operating its local equipment.
| Controller | Device instance | Online / total | Fresh | Held | Lost |
|---|---|---|---|---|---|
| AHU-01 | 11001 | — | — | — | — |
| AHU-02 | 11002 | — | — | — | — |
| VAV-01 | 12001 | — | — | — | — |
| FCU-01 | 13001 | — | — | — | — |
| BLR-01 | 21001 | — | — | — | — |
| CH-01 | 22001 | — | — | — | — |
| RTU-01 | 14001 | — | — | — | — |
| EF-01 | 15001 | — | — | — | — |
| REF-01 | 31001 | — | — | — | — |
Communication trial
Hold a device’s last readings, or disconnect it to remove the values. Restore updates to reconnect to its current state.
Office operation
A seasonal profile starts on Monday at 06:00. People occupy five zones on weekdays from 07:00 to 18:00. Equipment in Auto follows its schedule and local sequence.
Energy study
Run a copy of the current office, including its overrides and faults. Pause the building to compare schedules from the same starting conditions.
Select a seasonal profile to enable a study.
Air-handler moisture load
The two air handlers mix outdoor and return air. With chilled water flowing, a wet coil spends part of its cooling capacity condensing water. Profile changes take effect on the next equipment step.
- AHU-01 sensible cooling
- Loading
- Latent cooling
- Loading
- Condensate rate
- Loading
- Coil leaving humidity
- Loading