Earlier Level 6 portfolio

This is the original multi-lab assessment. Your saved dispatches, work in progress and signed reports are available here.

Final service and commissioning report

Review the equipment inventory and network riser. Trace each finding back to a measured point, include the corrective action, and identify the operator who regains control. In the energy study, pause the office and change only the schedule between two runs of at least 24 hours. Compare electricity and occupied comfort before recommending a change.

Review equipment inventory · Inspect network

Your verified practical records are attached below. The signed report and an independent knowledge pass are both required. The simulator verifies the practical checks. Your written conclusion is retained for review.

Practical outstanding.

Independent transfer assessment

Pass at 80%. Every safety item must also pass.

1. A plant delivers 150 tons at a measured 105 kW including pumps and tower. What is the observed input per ton?
2. The first event is a stale shared network update. Many zone alarms follow. Which evidence distinguishes a communication failure from a building-wide loss of control?
3. A terminal continually requests more pressure while its neighbors meet airflow. Which action best bounds a reset change?
4. An authorized deployment changes fan behavior unexpectedly. What supports a controlled handback? · Required for safety
5. Two studies report different kWh. Which comparison supports a proposed schedule change?