Skip to workspace
BAS Bridge
System explorer

Original module 11 assessment

Professional controls technician skills

Read the project record, communicate the evidence and control an authorized change from approval through rollback.

Module examination

Pass at 80%.

1. Which pair uniquely locates this process object on the simulated BACnet internetwork?
2. A 30% P8 command is released. P12 holds 60% and P16 holds 25%. Which output wins?
3. A controls change appears to resolve the complaint. Which handoff lets a second technician reproduce and reverse it?
4. Which statement best describes the result to the building manager?
5. 08:21 to 08:26 is how many minutes of observed operation?
6. The points list and latest mechanical schedule specify different sensor locations. What belongs in the discrepancy record?
7. Which service handoff best supports authorized future recovery?
8. A network riser and verified switch inventory disagree about one controller connection. What belongs in the report?