What you’ll learn
- Determine which occupied BACnet priority slot controls a commandable value.
- Trace weekly schedules, exceptions and the effect of relinquishing a slot.
Before you start · 2 related lessons
0 of 2 prerequisites demonstrated. You can open this lesson at any time.Read the winning command
A commandable A communication protocol for exchanging building automation data. Inspect the device, object and property that supply a displayed value. property can have a 16-slot priority array. The lowest-numbered non-null slot has the highest precedence. If every slot is null, Relinquish_Default supplies the value. A non-null zero is an explicit The effective instruction issued to a device. Compare it with actual travel, rotation or flow. and can override a lower-priority request to run. Local mechanical interlocks and protection still affect what the equipment physically does.
A calendar is one source of intent
Start with the controller's local date, time and time zone. Compare the weekly schedule with any active holiday, exception or temporary occupancy extension and its configured precedence. Then follow the resulting schedule output to the actual commandable point. An active manual override can mask a correct schedule change, allowing the weekly program to look broken at the equipment.
Return control deliberately
Record the effective value and active slots before a permitted simulated override. Release the same slot to null when the test ends. An explicit OFF left in that slot can continue to mask a schedule. After return to automatic control, verify which remaining priority or default becomes effective and observe the resulting equipment response.
- Weekly or exception schedule
- Scheduled request
- Highest-precedence non-null command
- Equipment permissives
- Physical status and airflow
Normal operation
Example training conditions
- In a fictional commandable output, a 50% scheduled value occupies slot 16. A temporary 35% command at slot 8 becomes effective. Releasing slot 8 restores the 50% request.
- Observe the active owner and allow the final device time to travel before checking feedback.
Worked service example
A fan fails to start after the holiday calendar reverts to the normal weekday.
Recorded field evidence · training example
- Weekly occupied request on; holiday ended yesterday
- Priority 8 = Off, priority 16 = On
- Effective fan command off, independent status off
The active priority-8 command explains the effective stop. Confirm ownership before releasing it. After release, priority 16 becomes effective as long as no higher-precedence slot is occupied.
Field procedure
- Verify the controller clock and the effective schedule at the complaint time.
- Inspect the entire priority array and identify the winning non-null slot.
- Release only the authorized test slot, then verify the resulting command and physical proof.
Hands-on exercise
Predict how the effective equipment state changes when an operating request changes but a downstream permission remains false.
Occupied start sequence
This training sequence releases the coil at 15 seconds if fan proof is present. Separate the run request, drive permission, measured fan response and coil release.
Capture a start request with the drive unavailable. Restore drive availability, then advance until proof releases the coil.
Unit 5 service call
The schedule changed. The equipment did not.
Trace a request to its active owner and prove who takes over on release. Bring back the source, reading and time of your strongest observation.
Open case simulatorStandalone simulator · free practice
AHU-01 heating valve priority array
Record the starting slots. In the simulator, write 35% at priority 12, then 70% at priority 8. Predict the command after releasing each test slot, higher priority first. Compare the effective request with valve feedback as the actuator travels.
Open simulator →Knowledge check
Pass at 80%. Every safety item must also pass.
Field takeaways
- Trace the schedule output and winning priority independently.
- Verify the resulting equipment response after a test override is released.