1. Air enters the reheat coil at 56°F and leaves at 76°F. What temperature rise must the diagnosis explain?
2. A cold discharge alarm appears only during warm-up. Two traces show cooling demand zero but the chilled-water valve stem partly open and supply air colder than mixed air. Which observation resolves the next uncertainty?
3. Local and colocated readings agree while several points are stale at the supervisor. Which comparison is most useful?
4. A pump start was requested at 10:14:12, drive-ready occurred at 10:14:19 and flow proof at 10:14:25. How many seconds elapsed from request to flow proof?
5. Safety trips at 12 s. Fan proof falls at 17 s. A proof alarm appears at 47 s. What delay follows the proof loss?
6. A verified drive run signal and motor speed are normal, but delivered airflow is zero. Which test most directly separates a mechanical delivery fault from a bad BAS flow indication?
7. All terminal zones begin oscillating immediately after AHU discharge swings. What should you examine first?
8. At 10:12:30, the last supervisory update was 10:08:00. What is the sample age?